The project, costed and billed.

Project Systems (PS) is the module that turns a won project into a structured, budgeted, billable thing. It holds the WBS and the BOQ, carries the project budget down to every work package, and ties site procurement and progress billing back to the same plan — so cost, commitment and revenue are read from one place rather than reconciled across spreadsheets after the fact.

What it is

A single structure for scope,
money and billing.

A project starts as scope and a number, and on most systems the two drift apart within weeks. Project Systems keeps them together. The WBS breaks the project into work packages, the BOQ prices the scope line by line in its own UOM, and the budget sits against the same structure — so a purchase, a GRN or a billed milestone always lands on a node someone can point to.

Core objects
  • WBS — work breakdown structure, the spine every cost and commitment hangs from
  • BOQ — bill of quantities priced by line, unit and rate
  • Project budget — planned cost allocated down to the work-package level
  • Milestones — the billable and reporting events along the schedule
  • Commitments — open PRs and POs linked to their WBS node
  • Progress measures — quantity executed against BOQ, the basis for billing
What it does

From budget to billed, on one plan.

Build the WBS and BOQ

Lay out the project as work packages and price the scope as a BOQ in the right UOM. The structure becomes the single reference for every downstream cost, commitment and bill.

Set and hold the budget

Allocate the project budget down each WBS node. Every PR and PO raised against the project checks available budget before it commits, so overspend is caught at approval, not at month-end.

Drive project procurement

Project demand raises a PR, runs through RFQ and award, and books against the work package it serves. Commitments and actuals roll up the WBS the moment a GRN or invoice posts.

Control cost in real time

Budget, committed, actual and forecast sit side by side per node. The variance a project head needs is a view, not a reconciliation exercise across purchase, stores and finance.

Bill on progress

Measure quantity executed against the BOQ and raise milestone or progress billing straight from the plan. Revenue recognised matches work certified, with the back-up traceable to the line.

Report the whole project

One structure carries scope, cost, commitment and billing, so cost-to-complete and earned value read consistently from the same source the team works in daily.

Which processes it powers

Where PS does its work.

Modules are how the platform is built; processes are how the business runs. Project Systems shows up wherever scope has to be costed, procured against and billed — the engine room of project-led work.

Project-to-Cash

WBS and BOQ through project procurement to progress billing and cash. PS is the spine of this flow.

Acquire-to-Retire

Capital projects costed and settled in PS, then capitalised to the asset they create.

Modules PS collaborates with

  • MM Material Mgmt — project PR, RFQ, PO and GRN booked to the WBS
  • FI Finance — budget, actuals, settlement and revenue from the same structure
  • VP Vendor Portal — project vendors quote and confirm against the live plan
Outcomes

What teams see with PS in place.

One
One structure — scope, budget, commitment and billing on a single WBS
Fewer
Fewer overruns — budget checked at PR, not discovered at close
Faster
Faster billing — progress bills raised from measured BOQ quantities
Live
Real-time cost — budget vs committed vs actual per node, no reconciliation